Roofing

from £16.00 net

Category: Tag:

ROOFING

ROOFING FROM:

ROOFING FROM:

ROOFING FROM:

PRICE DETAILS PER HOUR:

MIN. 10

PERSONS

MIN. 3

PERSONS

1 - 2

PERSONS

Price per hour £16.00 £16.50 £17.00
 Accommodation +£1.50 +£1.50 +£1.50
 Simple hand tools* +£0.30 +£0.30 +£0.30
 Simple power tools*  +£0.30 +£0.30 +£0.30
 Clothing
 Board

* Here you can find tools specification.

Thermal insulation for roofs and outer walls (according to energy saving regulations)

Roofing/covering house/industrial walls and rooftops with slate tiles, shingles, bitumen felt, roof tiles

Waterproofing of roof, wall and floor areas

Covering of outer walls (fronts) with various materials (slate, metal)

Building green roofs

Mounting of roof gutters

Installing roof windows (occasionally truss related works)

Installing lightning conductors

Applying bitumen, synthetic or liquid material sheeting for roof water proofing

Contract implementation time

Depending on your requirements the service companies can arrive at the given operation site within 10 working days after contract signing. This time frame is feasible if the working team is not obliged to speak English. If knowledge of English is a must, the team might arrive later.

Contract Period

The indicated prices are calculated for contracts which are signed for at least 3 weeks. If you order services for a shorter time, we will add individually calculated surgery costs to the prices.

English Speaking Team

There is an option of English speaking service providers. The additional cost is 1 GBP per hour per English speaking worker.

PRICE DETAILS PER HOUR:

MIN. 10

PERSONS

MIN. 3

PERSONS

1 - 2

PERSONS

Price per hour £16.00 £16.50 £17.00
 Accommodation +£1.50 +£1.50 +£1.50
 Simple hand tools* +£0.30 +£0.30 +£0.30
 Simple power tools*  +£0.30 +£0.30 +£0.30
 Clothing
 Board

* Here you can find tools specification.

Thermal insulation for roofs and outer walls (according to energy saving regulations)

Roofing/covering house/industrial walls and rooftops with slate tiles, shingles, bitumen felt, roof tiles

Waterproofing of roof, wall and floor areas

Covering of outer walls (fronts) with various materials (slate, metal)

Building green roofs

Mounting of roof gutters

Installing roof windows (occasionally truss related works)

Installing lightning conductors

Applying bitumen, synthetic or liquid material sheeting for roof water proofing

Contract implementation time

Depending on your requirements the service companies can arrive at the given operation site within 10 working days after contract signing. This time frame is feasible if the working team is not obliged to speak English. If knowledge of English is a must, the team might arrive later.

Contract Period

The indicated prices are calculated for contracts which are signed for at least 3 weeks. If you order services for a shorter time, we will add individually calculated surgery costs to the prices.

English Speaking Team

There is an option of English speaking service providers. The additional cost is 1 GBP per hour per English speaking worker.

PRICE DETAILS PER HOUR:

MIN. 10

PERSONS

MIN. 3

PERSONS

1 - 2

PERSONS

Price per hour £16.00 £16.50 £17.00
 Accommodation +£1.50 +£1.50 +£1.50
 Simple hand tools* +£0.30 +£0.30 +£0.30
 Simple power tools*  +£0.30 +£0.30 +£0.30
 Clothing
 Board

* Here you can find tools specification.

Thermal insulation for roofs and outer walls (according to energy saving regulations)

Roofing/covering house/industrial walls and rooftops with slate tiles, shingles, bitumen felt, roof tiles

Waterproofing of roof, wall and floor areas

Covering of outer walls (fronts) with various materials (slate, metal)

Building green roofs

Mounting of roof gutters

Installing roof windows (occasionally truss related works)

Installing lightning conductors

Applying bitumen, synthetic or liquid material sheeting for roof water proofing

Contract implementation time

Depending on your requirements the service companies can arrive at the given operation site within 10 working days after contract signing. This time frame is feasible if the working team is not obliged to speak English. If knowledge of English is a must, the team might arrive later.

Contract Period

The indicated prices are calculated for contracts which are signed for at least 3 weeks. If you order services for a shorter time, we will add individually calculated surgery costs to the prices.

English Speaking Team

There is an option of English speaking service providers. The additional cost is 1 GBP per hour per English speaking worker.

PRICE DETAILS PER HOUR:

MIN. 10

PERSONS

MIN. 3

PERSONS

1 - 2

PERSONS

Price per hour £16.00 £16.50 £17.00
 Accommodation +£1.50 +£1.50 +£1.50
 Simple hand tools* +£0.30 +£0.30 +£0.30
 Simple power tools*  +£0.30 +£0.30 +£0.30
 Clothing
 Board

* Here you can find tools specification.

Thermal insulation for roofs and outer walls (according to energy saving regulations)

Roofing/covering house/industrial walls and rooftops with slate tiles, shingles, bitumen felt, roof tiles

Waterproofing of roof, wall and floor areas

Covering of outer walls (fronts) with various materials (slate, metal)

Building green roofs

Mounting of roof gutters

Installing roof windows (occasionally truss related works)

Installing lightning conductors

Applying bitumen, synthetic or liquid material sheeting for roof water proofing

Contract implementation time

Depending on your requirements the service companies can arrive at the given operation site within 10 working days after contract signing. This time frame is feasible if the working team is not obliged to speak English. If knowledge of English is a must, the team might arrive later.

Contract Period

The indicated prices are calculated for contracts which are signed for at least 3 weeks. If you order services for a shorter time, we will add individually calculated surgery costs to the prices.

English Speaking Team

There is an option of English speaking service providers. The additional cost is 1 GBP per hour per English speaking worker.

Constructing and repairing roofs takes a lot of work and, when you have a large workload, you may want to consider outsourcing roofing workers.

By hiring additional roofers, you can take care of all of your roofing requirements during these busy periods. Our temporary labourers can help with building, covering, waterproofing, insulating and more. Get in touch with us and tell us what you require!

Reviews

There are no reviews yet.

Be the first to review “Roofing”

Your email address will not be published. Required fields are marked *

You may also like…

Are You interested in getting a Quote for a service you haven’t found?

No time to search? Just leave your phone number, and we will get back to you as soon as possible!

By continuing to use the site, you agree to the use of cookies. more information

The cookie settings on this website are set to "allow cookies" to give you the best browsing experience possible. If you continue to use this website without changing your cookie settings or you click "Accept" below then you are consenting to this.

Close